A & A Works
 
Supply and Apply New Painting ..
Supply & Installation of Tempo..
Provision of DFS Storeroom at ..
Proposed Alteration Works for ..
Re-layout Works at the Existin..
Refurbishment Work for 2nd Sit..
Modification Works of Entrance..
The Independent Schools Founda..
Refurbishment of Central DF St..
The Alteration and Addition Wo..
Design and Build for Improveme..
Supply & Installation of Tempo..

Addition Lift Landings and Lif..
Renovation Works to Shops 2-7,..

上一頁   下一頁
 



External Wall Repair Works for Stage XI of Taikoo Shing


Client                        :    Taikoo Shing (Management) Limited
Architect/Engineer      :    Taikoo Shing (Management) LimitedContract Sum             :    HK$26,110,090.00Commencement Date :    2 March 2005Completion Date         :    30 June 2006Job Details                 :       External wall repair works to nine blocks including repair to the defective area at external wall, repair/replacement of defective   mosaic tile, install A/C condensate pipe, replace sealant of window frame, replace defective drain pipe, etc



 




 
 
 
 
COPYRIGHT Fong Wing Shing Construction Co., Ltd. 2011 ALL RIGHT RESERVED. POWERED BY Cyber System Ltd.